<!--
document.writeln("SIP has its own Sewage Treatment Works (STW), which started to operate from December 1998. At present the sewage treatment capacity is 100,000 m3/day which will reach 500,000 m3/ day with the development of SIP.<br><br><font color=#666666><b>Charge</font></b><br><br>The installation fee for connecting sewage pipelines to the sewage network through the designated pre-laid connection points should be borne by consumers. <br><br>In addition, users should pay monthly for sewage discharged. The fee depends on the volume of sewage which generally is 80% of the water consumed, or measured by flow meter if needed.");
//-->
