document.writeln("SIP has its own Water Treatment Works (WTW). It draws raw water from Tai Lake. Treated water reaches the Drinking Water Standard of World Health Organization in 1993. The initial capacity is 150,000 m3/day and the capacity will eventually be increased to 600,000 m3/day following the the development of Industrial Park.<br><br><font color=#666666><b>Technical Description</font></b><br><br>Under normal circumstances, the pressure at any point shall be not less than 1.5 pa. Computer simulation revealed that the pressure in the water supply network is not less than 2.3 pa most of the time. Consumer can install their own water tank if they need to obtain a steady pressure of more than 1.5 pa, and if the pressure required is above 2.2 pa, water pump shall be used.<br><br><font color=#666666><b>Charge</font></b><br><br>Installation fee including Increase Capacity Fee (ICF) and Construction Fee should be paid in one lump sum when a user connects to the water supply network. In addition, consumer should pay monthly for the water consumed. The installation fee from the connection points pre-laid under the roads should be borne by consumers. ");
//-->