<!--
document.writeln("CSSD is responsible for the landfill before the land is transferred to investors. The prepared land would meet the following specifications: <br>1. The land shall not be lower than the flood level in a hundred years in Suzhou.<br>2. The compacted land shall not be less than 88% of light compaction.<br><br>");
//-->
